Running on Reserve

How data centres risk burning gas reserved for Australian homes and businesses

Aerial view of a large data centre with rooftop cooling units

Getting the data centre energy obligation right is critical to protecting the government’s planned gas reservation for Australian households and businesses. If the obligation doesn’t limit how much gas data centres can use, they could compete with households and manufacturers for scarce supply. Our analysis shows data centres could absorb much of the gas the reservation sets aside for Australian homes and businesses.

200 PJ

The most gas a year the reservation scheme could make available for Australian homes and businesses from 2028.

94%

Of that maximum would be burned by a 5 GW data centre fleet drawing half its power from gas.

24%

Would be used by one 2.16 GW Queensland campus, in a hypothetical case where it drew 30% of its power from gas.

5–10%

The tight cap we recommend on gas firming, with batteries and other clean technologies used first.

Clear limits on gas are needed to protect the proposed gas reservation

Australia’s east coast gas is already heavily committed, with about 75% shipped overseas as liquefied natural gas (LNG) from Curtis Island near Gladstone.

From 2028, a new gas reservation scheme will require LNG exporters to reserve up to 20% of new export volumes for the domestic market. This could make up to 200 petajoules (PJ) of gas a year available for Australian homes and businesses.

If a 5 GW data centre fleet drew 20% of its power from gas, it would burn about 75 PJ a year, or 38% of the maximum supply projected to be available for the reservation. At 50%, it would burn about 188 PJ, which is 94% of that maximum.

Gas reservation available to Australianhomes and businesses, PJ a year050100150200 PJReservation scheme frees upup to 200 PJ a year5 GW data centre fleet, 20% of power from gas75 PJ · 38%5 GW data centre fleet, 50% of power from gas188 PJ · 94%Percentages are shares of the maximum reservation. Sources: AEMO 2026 GSOO; CZI analysis.
The gas reservation squeeze. Data centres using gas for 20% or more of their power would burn through much of the reservation. Gas price impacts on households and businesses were not modelled. Sources: AEMO 2026 Gas Statement of Opportunities; CZI analysis.

24% of the maximum reservation would be used by one proposed 2.16 GW data centre campus in Queensland drawing 30% of its power from gas.

A single project can make a large difference. Zerra DC’s proposed 2.16 GW Western Downs Digital Park in Queensland, where Anthropic has agreed to lease the first stage, is one example. In a hypothetical case where the full campus drew 30% of its power from gas, it would use around 24% of the maximum reservation (CZI analysis). A Queensland carve-out that relies on state-owned gas generators would add further to this pressure.

Gas costs more and takes longer to build

Gas is also more expensive than the alternative, according to CSIRO and AEMO’s GenCost 2025–26 report. New gas generation connected via the grid also takes four to eight years to arrive, because order books for large gas turbines are full.

Firmed renewables

$104–$147

per megawatt hour (MWh)

New gas as the main fuel

$135–$204

per megawatt hour (MWh)

New gas generation via the grid

4–8 years

to arrive, with turbine order books full

Wind turbines on dry rolling farmland

Our recommendation

Clean firming first, gas capped

Data centres should firm their supply with batteries and other clean technologies, keeping gas in reserve for industrial users that support Australian manufacturing and small businesses. Firming with gas should be minimal and tightly capped at 5–10%.

Cover page of the Running on Reserve briefing note

Read the briefing note

The one-page briefing note sets out the numbers, the sources and our recommendation for the data centre energy obligation.

Key terms

Petajoule (PJ) is a unit of energy used to measure large volumes of gas.

Liquefied natural gas (LNG) is gas cooled to a liquid so it can be shipped overseas.

The gas reservation scheme requires LNG exporters to reserve part of their gas for Australian users.